On Sunday 11th August, the 229ft (70m) long Tintagel Castle footbridge was opened. The bridge sits 57m above sea level and has two independant cantilevers of 33m long each. Matthieu MalliƩ, Ney & Partners will talk about the design challenges of this bridge at the SCI UK Steel Construction Day 2019, 7 November 2019, London. Find out more: https://bbc.in/2MZlhtU
To find out more about speakers at this event and to register visit the:
